A walkthrough iTWO

RIB's 5D BIM Virtual Design & Construction software

iTWO 4.0 Smart production

iTWO Lab session

Master students from Madrid Polytechnic University in the iTWO Lab 

iTWO 5D Simulation

Georgia Tech iTWO Tower 

New Way of Construction

Introduction to the virtual & physical process integration with iTWO.

iTWO 5D Construction Method

A more in-depth look into the iTWO software.

iTWO 5D Project Delivery Explained

RIB Americas CTO Mickey Carr on the 5D process.

Interview with Client: 
Miami International Airport

Mr. Juan & Mr. Ashish Kumar on their VDC strategy and motivation for choosing RIB iTWO. 

Interview with Client: 
Georgia Institute of Technology

Mr. Steve Swant on their VDC strategy and motivation for choosing RIB iTWO. 

Interview with Main Contractor:
MTH Group 

Process Director, Niels Falk from MTH, on their VDC strategy and motivation for choosing RIB iTWO.

Interview with Main Contractor:
YIT Corporation

Mr. Vesa Pirinen & Mr. Juha Rissanen from YIT on their VDC strategy and motivation for choosing RIB iTWO.

Interview with Main Contractor:
Max Bögl Group

Mr. Mathias Bartl from Max Bögl on their VDC strategy and motivation for choosing RIB iTWO.

iTWO 5D LAB

With help from McKinsey and Stanford University we have created an environment where we can simulate a complete project lifecycle.

 

iTWOcx:
Advanced Project Collaboration

Introduction to our project collaboration platform iTWOcx that includes extranet, e-tendering, decision workflows, snagging and mobile capabilities.

iTWOcx: Workflows

A more in-depth introduction to decisions workflow capabilities with iTWOcx.